Project Manager

A project manager is a professional in the field of project management. Project managers can have the responsibility of the planning, execution, and closing of any project, typically relating to construction industry, engineering, architecture, computing, or telecommunications. Many other fields in the production engineering and design engineering and heavy industrial also have project managers. A project manager is the person accountable for accomplishing the stated project objectives. Key project management responsibilities include creating clear and attainable project objectives, building the project requirements, and managing the triple constraint for projects, which is cost, time, and scope. A project manager is often a client representative and has to determine and implement the exact needs of the client, based on knowledge of the firm they are representing. The ability to adapt to the various internal procedures of the contracting party, and to form close links with the nominated representatives, is essential in ensuring that the key issues of cost, time, quality and above all, client satisfaction, can be realized. Like any human undertaking, projects need to be performed and delivered under certain constraints. Traditionally, these constraints have been listed as scope, time, and cost.These are also referred to as the project management triangle, where each side represents a constraint. One side of the triangle cannot be changed without affecting the others. A further refinement of the constraints separates product quality or performance from scope, and turns quality into a fourth constraint. The time constraint refers to the amount of time available to complete a project. The cost constraint refers to the budgeted amount available for the project. The scope constraint refers to what must be done to produce the project's end result. These three constraints are often competing constraints: increased scope typically means increased time and increased cost, a tight time constraint could mean increased costs and reduced scope, and a tight budget could mean increased time and reduced scope. The discipline of project management is about providing the tools and techniques that enable the project team (not just the project manager) to organize their work to meet these constraints. The work breakdown structure is a tree structure, which shows a subdivision of effort required to achieve an objective; for example a program, project, and contract. The WBS may be hardware, product, service, or process oriented. A WBS can be developed by starting with the end objective and successively subdividing it into manageable components in terms of size, duration, and responsibility (e.g., systems, subsystems, components, tasks, subtasks, and work packages), which include all steps necessary to achieve the objective.[17] The work breakdown structure provides a common framework for the natural development of the overall planning and control of a contract and is the basis for dividing work into definable increments from which the statement of work can be developed and technical, schedule, cost, and labor hour reporting can be established.

Car Rental Classification Code

The ACRISS Car Classification Code is a code used by many car rental companies, including Avis, Hertz, Alamo, Europa car and National, for classifying vehicles. ACRISS stands for Association of Car Rental Industry Systems and Standards. The code has four letters, each of which represents an attribute of the vehicle. First letter: Class
M = Mini
E = Economy
C = Compact
I = Intermediate
S = Standard
F = Full Size
P = Premium
L = Luxury
X = Special
Second letter: Type
B = 2 Doors
C = 2/4 Doors
D = 4 Doors
W = Wagon
V = Van (6+ passengers)
L = Limousine
S = Sport
T = Convertible
F = 4-Wheel Drive
P = Pick Up
J = All Terrain
K = Van (cargo)
X = Special
Third letter: Transmission
A = Automatic
M = Manual
Fourth letter: Air Conditioning
R = Yes
N = No wiki Car Classification Code The ACRISS Car Classification Code is a code used by many car rental companies, including Avis, Hertz, Alamo, Europcar and National, for classifying vehicles. ACRISS stands for Association of Car Rental Industry Systems and Standards. The code has four letters, each of which represents an attribute of the vehicle. First letter: Class M = Mini E = Economy C = Compact I = Intermediate S = Standard F = Full Size P = Premium L = Luxury X = Special Second letter: Type B = 2 Doors C = 2/4 Doors D = 4 Doors W = Wagon V = Van (6+ passengers) L = Limousine S = Sport T = Convertible F = 4-Wheel Drive P = Pick Up J = All Terrain K = Van (cargo) X = Special Third letter: Transmission A = Automatic M = Manual Fourth letter: Air Conditioning R = Yes N = No

Car classification is subjective since many vehicles fall into multiple categories or do not fit well into any. Not all car types are common in all countries and names for the same vehicle can differ by region. Furthermore, some descriptions may be interpreted differently in different places. Broadly speaking, there are a set of classifications which are widely understood in North America, and another set which are somewhat understood in English-speaking contexts in Europe. Some terms borrowed from non-English languages may have different meanings when used in their native language.